vSite
1-800-503-3027
Video placeholder · header loop

WHO WE SERVEFIELDOFFICE

Fiber and cable construction, documented foot by foot

Fiber and cable crews cross more existing utilities than anyone. vSite shows what’s in the ground before you bore or trench, records every conduit and handhole as you place it, and turns the day’s footage into cost and billing.

How it works
Tablet on a GNSS pole showing colour-coded utility layers next to an excavator
Conduit run, Block 12FIELDOFFICE
Installed today640 ft of conduit
RecordsRedlines, depth and 3D scans
Sent toGIS and vSite Office

Overview

Many crews, many streets, records that rarely match

Fiber builds move fast across long routes and many crews. Locates, depth of cover and the exact path of each conduit are hard to capture, and the as-built often comes weeks later.

With vSite, crews check existing utilities in AR before boring or trenching, scan pits and crossings, and redline the conduit as it goes in.

Installed footage rolls up by cost code and pay item every day, so the office sees production and cost by route, not at month end.

Daily

installed footage by route

Depth

of cover recorded with each scan

“The contractor ultimately bears the cost of mislocates.”
Valard, on locates

How it works

From the locate to the as-built

  1. 1

    Check the route

    Existing utilities and locates shown before boring or trenching.

  2. 2

    Scan pits and crossings

    Depth of cover and every crossing captured in 3D.

  3. 3

    Redline the conduit

    The installed path, handholes and splice points on the map.

  4. 4

    Report production

    Footage by cost code and pay item, every evening.

What helps

What helps fiber and cable crews

Plans

Included in Crew, Project and Enterprise plans

Fiber and cable contractors usually run vSite on a Crew plan, covering every route a crew works in the year.

See pricing

FIELDOFFICE

  • Flat annual fee, no per-user fees
  • Unlimited users and guests
  • Web, mobile app, AR and scanner
  • Setup and support by vGIS

FAQ

Fiber and cable questions

Does it work for directional drilling?

Yes. Crews check existing utilities along the bore path and record entry, exit and pit locations with depth.

Can we export as-builts to the network owner?

Yes. Export to Esri ArcGIS, CAD or GeoJSON-compatible formats, or share a view by link.

How do we track production?

Footage is measured from the redlines and rolled up by route, cost code and pay item.

Locator scanning a street

Try it on one project

We load one route, pair your receiver, and a crew documents its first day with us.

Video placeholder · product overview, 1:30

vSite in 90 seconds

One street, one day: from the utilities underground to the cost of what was installed.

  1. 0:00Before you dig: utilities over the street view
  2. 0:25Redline and scan what’s installed
  3. 0:50Quantities by pay item, measured
  4. 1:10Hours and cost by cost code, same evening

PILOT

{{ form.title }}

One live project, your crew and your cost codes. Tell us a little and we’ll set it up with you.

One project, priced like any other. Cancel within 30 days if it isn’t paying off. We only use your details to plan the pilot.

Thanks, {{ form.v.firstName }}.

We’ve got your request. Someone from our team will contact you to pick the project and the start date.